# June 2026 BTO Vibes — rebuild recipe

Revision: bto-jun26-20260909-5691c8f3

Reconstructed recipe; not the original prompts. End-to-end regeneration is untested.

Historical June 2026 study. Anchors, walk times and neighbourhood scores are approximate; prices and rules in screenshots are not current housing guidance.

## 1. Define the experience

Build a new interpretation of June 2026 BTO Vibes: A dated comparison of June 2026 BTO sites, neighbourhood amenities and decision lenses. Read the repository instructions and preserve existing work first. Reconstruct the idea from this selection; do not promise an exact recreation. Start with one complete useful flow.

## 2. Prepare sources and assets

Retain HDB source links, reference maps, dated price snapshots, rough anchors and scoring formulas. Label generated estimates and distinguish official project details from editorial lenses.

## 3. Build the core flow

Build explore, compare and methodology views. Explain every score and distance assumption, show data dates and test missing amenity coverage. Do not revive the shelved email-proof poll as a working feature without a separate implementation and privacy review.

## 4. Leave a working handoff

Check the real production route, keyboard operation, mobile layout, reduced motion, asset loading and failure states. Record what passed and what remains untested. Leave source, lockfiles, setup instructions, data provenance and unique selected assets in a compact package. Exclude secrets, dependencies and caches. Label reconstructed prompts honestly; a local package is not a NAS backup.
